Commercial Exterior Painting

Facades, cladding, structural steel, railings, and parking structures. Access and weather decide the programme far more than the square footage does.

How the work runs

  1. Step 01

    Survey access first

    Scaffold, boom, or rope access is decided before anything else, because it sets both the cost and the sequence. Method statements and RAMS go to your property manager with the quote.

  2. Step 02

    Assess the substrate

    Render, brick, cladding, and steel each fail differently. We identify what is actually failing, and whether it is a coating problem or a water problem, before specifying anything.

  3. Step 03

    Clean and repair

    Washed down, loose material removed back to a sound edge, corroded steel taken back and treated, and failed sealant cut out and replaced.

  4. Step 04

    Prime and coat to spec

    Manufacturer-specified systems applied within their stated temperature and humidity range, with wet-film thickness checked as we go rather than assumed.

We will move a start date rather than coat a damp substrate or paint outside the product's stated range. That call costs a week and saves a repaint.