Service
Commercial Interior Painting
Part of Commercial Painting.
How the work runs
Step 01
Agree the working window
Evenings, weekends, or floor-by-floor during the day, set with your facilities contact before we quote. The window drives the price, so it is fixed in writing rather than assumed.
Step 02
Section and protect
One area is sealed and sheeted at a time, with routes in and out kept clear. Furniture and equipment are moved and returned each shift, not left stacked overnight.
Step 03
Prep to the same standard
Filled, sanded, and spot-primed exactly as a house would be. Commercial does not mean one thin coat over whatever is already there.
Step 04
Coat for the traffic
Scrubbable finishes in corridors and washrooms, low-odour and fast-return products where people are back in the space the next morning.
Step 05
Sign off by area
Each area is walked and signed off as it completes, so nothing accumulates into one punch list at the end of the job.
Out-of-hours work is quoted at the rate agreed up front. We do not reprice once the schedule is set.
