Skip to content
Bello Painting

Service

Exterior House Painting

Siding, trim, soffits, fascia, and doors. Exterior work lives or dies on preparation and on picking the right window in the season.

How the work runs

  1. Step 01

    Wash and dry

    Surfaces washed to remove chalking, dirt, and mildew, then given the time they need to dry through before anything is applied.

  2. Step 02

    Scrape and sand

    Loose and failing paint removed back to a sound edge, then feathered so the transition does not telegraph through the finish.

  3. Step 03

    Repair and seal

    Failed caulk cut out and replaced, rot and soft trim addressed before coating, gaps sealed where water would otherwise get behind the finish.

  4. Step 04

    Prime and coat

    Bare wood and repairs primed, then two finish coats applied within the temperature and humidity range the product specifies.

We do not paint over damp substrate or outside the manufacturer's stated temperature range, even when it costs us the week.

Get a walkthrough and an itemised estimate